PANOPTES User Guide
  • PANOPTES User Guide
  • FAQ
  • Building
    • Getting Started
      • Building Overview
      • Safety Guide
      • Parts Listing
    • Hardware Build
      • Camera Box
        • Camera Setup
        • Electronics
        • Hardware and Assembly
        • 4 Camera Design
      • Control Box
        • Electronics
        • Hardware and Assembly
      • Power and Network
        • Network Setup
        • Host Site (Mains) Power
        • UPS and Battery Backup
        • Power Distribution
      • Mount and Pier
        • Pier
          • Fabrication
          • Assembly
        • Mount
          • Assembly
          • Saddle Plate Rotation
          • Balancing
    • Software
      • Installing OS
      • Installing POCS
        • PANOPTES Unit Install
        • Developer Install
      • Arduino - Power Distribution
  • Deploying
    • Deployment Guide
      • Site Planning
      • Camera Focus
      • Polar Alignment
        • Overview
        • Drift Method
        • Procedure
          • Find Misalignment
          • Fix Misalignment
  • Running
    • Operating Guides
      • Automated Operation
      • Manual Operation
Powered by GitBook

Links:

  • Website
  • Forum
  • Software

2023 Project PANOPTES

On this page

Was this helpful?

  1. Building
  2. Hardware Build
  3. Power and Network

Host Site (Mains) Power

This is a guide for the steps related to getting mains AC power to the PANOPTES unit control box.

WARNING!

The mains power is operating at a high voltage compared to everything else and you can cause serious injury to yourself or others if you are not careful. Be sure to follow all the recommendations given below.

If you have not worked with AC mains power before then make sure you work with someone else for supervision. The safety of you and your team is more important than a working part!

WARNING!

PreviousNetwork SetupNextUPS and Battery Backup